Nov 16 resultArticle 6 passedAt least 85% yes · Thank you, CarlisleWhat happens next

The source material

Documents

The reports, public records, and project materials behind the work to reopen Ferns and strengthen Carlisle Center—all in one place.

11public PDFs

01 · Engineering

Studies and technical memoranda

The engineering work behind the proposed wastewater connection and the alternatives considered for Ferns.

  1. PDF · 10 pages

    Phase I wastewater connection feasibility study

    Weston & Sampson’s Phase I review of treatment capacity, public infrastructure, and the feasibility of a shared connection to the Carlisle Public School facility.

  2. PDF · 5 pages

    Wastewater distribution system process and considerations

    A technical memorandum describing the feasibility-study, design, permitting, and construction steps for a possible Carlisle Town Center wastewater system.

  3. PDF · 8 pages

    Carlisle Town Center wastewater connection feasibility study proposal

    Weston & Sampson’s original proposal for evaluating wastewater connections in Carlisle Town Center, including the scope of work and proposed fee.

  4. PDF · 4 pages

    Ferns wastewater disposal review

    An engineering review of wastewater disposal options and the site constraints that shape a long-term solution for Ferns.

02 · Public record

MassDEP records

Public copies of agency determinations, inspection materials, and correspondence concerning the Ferns property.

  1. PDF · 3 pages

    MassDEP regulatory requirements for Ferns — public copy

    MassDEP outlines the wastewater permit-modification process, requirements for any interim septic use, and the replacement-well process.

  2. PDF · 1 page

    MassDEP wastewater discussion and WWTF clarification — public copy

    Agency correspondence clarifying the status of wastewater discussions, regulatory authority, and statements about treatment capacity.

  3. PDF · 31 pages

    Ferns public-water-system sanitary survey — public copy

    MassDEP’s inspection report, Notice of Noncompliance, and compliance materials covering the public water system and required corrective actions.

  4. PDF · 1 page

    MassDEP approving-authority determination — public copy

    MassDEP recounts the property’s septic-variance history and confirms its role as approving authority for septic-system matters at Ferns.

03 · Project materials

Briefings and community materials

Plain-language summaries of the proposal, the November 16 vote, and the case for a shared Town Center solution.

  1. PDF · 20 pages

    Carlisle Center wastewater: full project scope

    The complete public briefing on the proposed scope, engineering path, funding possibilities, safeguards, and next decisions.

  2. PDF · 2 pages

    Article 6 flyer

    A shareable summary of what Article 6 would fund and how the project would proceed after the November 16 vote.

04 · Background research

Historical sources and findings

A source-linked compilation of the Town records and historical findings referenced in the site’s history section.

  1. PDF · 6 pages

    Carlisle Center: wastewater, septic systems & drinking water

    A collection of relevant historical quotations and documented findings, with links back to the original public sources.