The source material
Documents
The reports, public records, and project materials behind the work to reopen Ferns and strengthen Carlisle Center—all in one place.
11public PDFs
01 · Engineering
Studies and technical memoranda
The engineering work behind the proposed wastewater connection and the alternatives considered for Ferns.
Phase I wastewater connection feasibility study
Weston & Sampson’s Phase I review of treatment capacity, public infrastructure, and the feasibility of a shared connection to the Carlisle Public School facility.
Wastewater distribution system process and considerations
A technical memorandum describing the feasibility-study, design, permitting, and construction steps for a possible Carlisle Town Center wastewater system.
Carlisle Town Center wastewater connection feasibility study proposal
Weston & Sampson’s original proposal for evaluating wastewater connections in Carlisle Town Center, including the scope of work and proposed fee.
Ferns wastewater disposal review
An engineering review of wastewater disposal options and the site constraints that shape a long-term solution for Ferns.
02 · Public record
MassDEP records
Public copies of agency determinations, inspection materials, and correspondence concerning the Ferns property.
MassDEP regulatory requirements for Ferns — public copy
MassDEP outlines the wastewater permit-modification process, requirements for any interim septic use, and the replacement-well process.
MassDEP wastewater discussion and WWTF clarification — public copy
Agency correspondence clarifying the status of wastewater discussions, regulatory authority, and statements about treatment capacity.
Ferns public-water-system sanitary survey — public copy
MassDEP’s inspection report, Notice of Noncompliance, and compliance materials covering the public water system and required corrective actions.
MassDEP approving-authority determination — public copy
MassDEP recounts the property’s septic-variance history and confirms its role as approving authority for septic-system matters at Ferns.
03 · Project materials
Briefings and community materials
Plain-language summaries of the proposal, the November 16 vote, and the case for a shared Town Center solution.
04 · Background research
Historical sources and findings
A source-linked compilation of the Town records and historical findings referenced in the site’s history section.